init
This commit is contained in:
@@ -0,0 +1,79 @@
|
||||
# Advanced Sequential Thinking Strategies
|
||||
|
||||
Additional sophisticated patterns for complex scenarios.
|
||||
|
||||
## Uncertainty Management
|
||||
|
||||
Handle incomplete information systematically.
|
||||
|
||||
```
|
||||
Thought 2/7: Need to decide X
|
||||
Thought 3/7: Insufficient data—two scenarios possible
|
||||
Thought 4/7 [SCENARIO A if P true]: Analysis for A
|
||||
Thought 4/7 [SCENARIO B if P false]: Analysis for B
|
||||
Thought 5/7: Decision that works for both scenarios
|
||||
Thought 6/7: Or determine critical info needed
|
||||
Thought 7/7 [FINAL]: Robust solution or clear info requirement
|
||||
```
|
||||
|
||||
**Use for**: Decisions under uncertainty, incomplete requirements.
|
||||
|
||||
**Strategies**:
|
||||
- Find solution robust to uncertainty
|
||||
- Identify minimal info needed to resolve
|
||||
- Make safe assumptions with clear documentation
|
||||
|
||||
## Revision Cascade Management
|
||||
|
||||
Handle revisions that invalidate multiple subsequent thoughts.
|
||||
|
||||
```
|
||||
Thought 1/8: Foundation assumption
|
||||
Thought 2/8: Build on Thought 1
|
||||
Thought 3/8: Further build
|
||||
Thought 4/8: Discover Thought 1 invalid
|
||||
Thought 5/8 [REVISION of Thought 1]: Corrected foundation
|
||||
Thought 6/8 [REASSESSMENT]: Which of 2-3 still valid?
|
||||
- Thought 2: Partially valid, needs adjustment
|
||||
- Thought 3: Completely invalid
|
||||
Thought 7/8: Rebuild from corrected Thought 5
|
||||
Thought 8/8 [FINAL]: Solution on correct foundation
|
||||
```
|
||||
|
||||
**Key**: After major revision, explicitly assess downstream impact.
|
||||
|
||||
## Meta-Thinking Calibration
|
||||
|
||||
Monitor and adjust thinking process itself.
|
||||
|
||||
```
|
||||
Thought 5/9: [Regular thought]
|
||||
Thought 6/9 [META]: Past 3 thoughts circling without progress
|
||||
Analysis: Missing key information
|
||||
Adjustment: Need to research X before continuing
|
||||
Thought 7/9: Research findings on X
|
||||
Thought 8/9: Now can proceed with informed decision
|
||||
Thought 9/9: [Resume productive path]
|
||||
```
|
||||
|
||||
**Use when**: Stuck, circling, or unproductive pattern noticed.
|
||||
**Action**: Pause, identify issue, adjust strategy.
|
||||
|
||||
## Parallel Constraint Satisfaction
|
||||
|
||||
Handle multiple independent constraints simultaneously.
|
||||
|
||||
```
|
||||
Thought 2/10: Solution must satisfy A, B, C
|
||||
Thought 3/10 [CONSTRAINT A]: Solutions satisfying A: {X, Y, Z}
|
||||
Thought 4/10 [CONSTRAINT B]: Solutions satisfying B: {Y, Z, W}
|
||||
Thought 5/10 [CONSTRAINT C]: Solutions satisfying C: {X, Z}
|
||||
Thought 6/10 [INTERSECTION]: Z satisfies all
|
||||
Thought 7/10: Verify Z feasible
|
||||
Thought 8/10 [BRANCH if infeasible]: Relax which constraint?
|
||||
Thought 9/10: Decision on constraint relaxation if needed
|
||||
Thought 10/10 [FINAL]: Optimal solution given constraints
|
||||
```
|
||||
|
||||
**Use for**: Optimization problems, multi-criteria decisions.
|
||||
**Pattern**: Analyze independently → Find intersection → Verify feasibility.
|
||||
Reference in New Issue
Block a user